How Long Does a Website Redesign Take?
The build is rarely what takes the time. Content and decisions are. Here’s a realistic timeline for a small redesign and how to keep it on schedule.

For a small business site of about five pages, a redesign with me usually takes about 3 to 6 weeks from the go-ahead to launch. Larger sites, online stores, and sites with custom tools take longer, and the quote says how long.
Other designers will give you other numbers, and the honest ones will tell you the same thing I will: most of the timeline depends on you.
First: is it a redesign at all?
“Redesign” covers three different jobs with very different timelines:
- A fix. One or two specific problems. Often done in days.
- A refresh. New words, photos, and styling on the same pages and platform. Often one to three weeks.
- A rebuild. A new site that carries over what works from the old one. The 3 to 6 weeks above.
When to redesign your business website helps you tell which you need. The rest of this article is about a rebuild.
The stages
1. Scope and quote. A conversation, a look at the current site, and a written scope with a fixed price. Usually a few days. Bigger projects start with a longer discovery session.
2. Content. Gathering the words, photos, and facts: services, prices, service area, reviews, license numbers. This is the stage that stretches.
3. Prototype. A working version with your real content, on a private link you can try on your phone. You review it and ask for changes.
4. Build and test. Finishing every page, then testing each page, button, and form on phones.
5. Launch. Redirects from old page addresses to new ones, your approval, and the switch. Then a few weeks of watching Search Console for anything missed.
What actually sets the timeline
How quickly content arrives. This is the big one. A site waiting on photos of finished work or a rewritten services list sits still, however fast the build is.
How quickly decisions get made. One person who can say yes moves faster than a group that needs a meeting.
How many rounds of changes. A round or two is normal. Reopening settled decisions adds weeks.
What the site has to do. Booking, a store, or a quote calculator each add time, mostly in working out the rules.
What the old site ranks for. If it brings in visitors from Google, the pages that do need mapping to the new site. That’s care, not delay, but it takes a little time.
How to keep it moving
- Gather content before you start. A folder with your logo, 15 to 20 photos of your own work, and a list of services is half the project.
- Name one decision-maker.
- Give feedback in one batch per round, not a trickle.
- Pick a real deadline. “Before spring” focuses everyone. Tell your designer early.
- Decide what can wait. Launch with the pages that matter and add the rest after.
Will the site be down during a redesign?
No. The new site is built separately and the old one stays live until the switch, which takes minutes.
Will I lose my Google rankings?
Not if the move is handled properly: page addresses kept where possible, redirects for the rest, and the content that ranks carried across. Website redesign explains the steps I follow.
A realistic example
For a five-page rebuild where the owner has photos and a rough idea of the words:
| Week | What happens |
|---|---|
| 1 | Scope agreed, content gathered |
| 2 | Prototype with real content |
| 3 | Your feedback, revisions |
| 4 | Build finished, tested on phones |
| 5 | Final approval and launch |
If content takes a month to arrive, add a month.
Want a timeline for yours?
Send me the address of your current site and what’s bothering you about it. I’ll tell you whether it needs a fix, a refresh, or a rebuild, and how long I’d expect it to take.